Windflow installed three turbines at Monan between December 2014 and March 2015.
Turbine(s) 1 + 2 x Windflow 33-500
Commissioned Dec 2014 and Mar 2015
Developer A JV between Windflow Hammer Limited and the North Harris Trading Company Limited (the trading arm of local community group the North Harris Trust)
Project manager Windflow Hammer Limited
Principal Contractor, roads, foundation, trenching Duncan Mackay and Sons Limited
Electrical balance of plant G2 Energy Limited
Cranes John Maciver and Sons, Stoddart Crane Hire
Installation Bryan J Rendall (Electrical) Limited
Key facts Despite the elevated and windy site, no other manufacturer was prepared to put its turbines on this site due to the extreme turbulence. Windflow’s load-avoiding 2 bladed design and our experience of operating at severe sites are key differentiators. This is our first JV with a community group.